380.256 PEOPLE
People | Locations | Statistics |
---|---|---|
Seuring, Stefan |
| |
Nor Azizi, S. |
| |
Pato, Margarida Vaz |
| |
Kölker, Katrin |
| |
Huber, Oliver |
| |
Király, Tamás |
| |
Spengler, Thomas Stefan |
| |
Al-Ammar, Essam A. |
| |
Dargahi, Fatemeh |
| |
Mota, Rui |
| |
Mazalan, Nurul Aliah Amirah |
| |
Macharis, Cathy | Brussels |
|
Arunasari, Yova Tri |
| |
Nunez, Alfredo | Delft |
|
Bouhorma, Mohammed |
| |
Bonato, Matteo |
| |
Fitriani, Ira |
| |
Autor Correspondente Coelho, Sílvia. |
| |
Pond, Stephen |
| |
Okwara, Ukoha Kalu |
| |
Toufigh, Vahid |
| |
Campisi, Tiziana | Enna |
|
Ermolieva, Tatiana |
| |
Sánchez-Cambronero, Santos |
| |
Agzamov, Akhror |
|
Reid, John D.
in Cooperation with on an Cooperation-Score of 37%
Topics
Publications (26/26 displayed)
- 2016Development of a Retrofit, Low-Deflection Temporary Concrete Barrier System
- 2015Minimum Effective Length for the Midwest Guardrail Systemcitations
- 2014Dynamic Evaluation of MGS Stiffness Transition With Curb
- 2013Dynamic Evaluation and Implementation Guidelines for a Nonproprietary W-Beam Guardrail Trailing-End Terminalcitations
- 2013Dynamic Evaluation and Implementation Guidelines for a Nonproprietary W-Beam Guardrail Trailing-End Terminal
- 2012Determination of the Maximum MGS Mounting Height– Phase II Detailed Analysis Using LS-DYNA®
- 2011Nonblocked Midwest Guardrail System for Wire-Faced Walls of Mechanically Stabilized Earthcitations
- 2010Investigating the Use of a New Universal Breakaway Steel Post – Phase 3
- 2010New Test Level 2 Rough Stone Masonry Guardwall
- 2010Development of a Temporary Concrete Barrier to Permanent Concrete Median Barrier Approach Transition
- 2010Development of the MGS Approach Guardrail Transition Using Standardized Steel Posts
- 2008Development of the Midwest Guardrail System for Standard and Reduced Post Spacing and in Combination With Curbs: Part Two
- 2008Evaluation of Critical Flare Rates for the Midwest Guardrail System (MGS)
- 2007Performance of Steel-Post, W-Beam Guardrail Systemscitations
- 2007Midwest Guardrail System for Long-Span Culvert Applicationscitations
- 2007Guardrail Flare Rates
- 2007Development of Tie-Down and Transition Systems for Temporary Concrete Barrier on Asphalt Road Surfaces
- 2006Tie-Downs and Transitions for Temporary Concrete Barriers
- 2004Midwest guardrail system for standard and special applicationscitations
- 2003Design and Testing of Tie-Down Systems for Temporary Barriers
- 2003New Energy-Absorbing High-Speed Safety Barriercitations
- 2003DEVELOPMENT OF A STEEL H-SECTION TEMPORARY BARRIER FOR USE IN LIMITED DEFLECTION APPLICATIONS
- 2001Compliance Testing of a Bullnose Median Barrier System; NCHRP Report 350citations
- 2001GUARDRAIL AND GUARDRAIL TERMINALS INSTALLED OVER CURBS - PHASE II
- 2000CRASH TESTING OF MISSOURI'S W-BEAM TO THRIE BEAM TRANSITION ELEMENT
- 2000GUARDRAIL AND GUARDRAIL TERMINALS INSTALLED OVER CURBS
Places of action
Organizations | Location | People |
---|