380.256 PEOPLE
People | Locations | Statistics |
---|---|---|
Seuring, Stefan |
| |
Nor Azizi, S. |
| |
Pato, Margarida Vaz |
| |
Kölker, Katrin |
| |
Huber, Oliver |
| |
Király, Tamás |
| |
Spengler, Thomas Stefan |
| |
Al-Ammar, Essam A. |
| |
Dargahi, Fatemeh |
| |
Mota, Rui |
| |
Mazalan, Nurul Aliah Amirah |
| |
Macharis, Cathy | Brussels |
|
Arunasari, Yova Tri |
| |
Nunez, Alfredo | Delft |
|
Bouhorma, Mohammed |
| |
Bonato, Matteo |
| |
Fitriani, Ira |
| |
Autor Correspondente Coelho, Sílvia. |
| |
Pond, Stephen |
| |
Okwara, Ukoha Kalu |
| |
Toufigh, Vahid |
| |
Campisi, Tiziana | Enna |
|
Ermolieva, Tatiana |
| |
Sánchez-Cambronero, Santos |
| |
Agzamov, Akhror |
|
Mosheiov, Gur
in Cooperation with on an Cooperation-Score of 37%
Topics
Publications (19/19 displayed)
- 2023Dynamic scheduling problems in theory and practice
- 2023Scheduling to maximize the weighted number of on-time jobs on parallel machines with bounded job-rejectioncitations
- 2023A note: maximizing the weighted number of Just-in-Time jobs for a given job sequence
- 2022Single machine scheduling with step-learningcitations
- 2022On the tractability of hard scheduling problems with generalized due-dates with respect to the number of different due-datescitations
- 2021Minimizing the total tardiness and job rejection cost in a proportionate flow shop with generalized due datescitations
- 2021Minmax due-date assignment on a two-machine flowshopcitations
- 2020Editorial: Dynamic Scheduling Problems
- 2020Scheduling problems with a weight-modifying-activitycitations
- 2020Single machine scheduling to maximize the number of on-time jobs with generalized due-datescitations
- 2020Flowshop scheduling with learning effect and job rejectioncitations
- 2018A note: minimizing total absolute deviation of job completion times on unrelated machines with general position-dependent processing times and job-rejectioncitations
- 2017Scheduling with two competing agents to minimize total weighted earlinesscitations
- 2016Minimizing maximum cost on a single machine with two competing agents and job rejectioncitations
- 2015Minimizing the number of early jobs on a proportionate flowshopcitations
- 2015Scheduling with a due-window for acceptable lead-timescitations
- 2014The optimal number of used machines in a two-stage flexible flowshop scheduling problemcitations
- 2013Maximizing the weighted number of just-in-time jobs on a single machine with position-dependent processing timescitations
- 2013Minmax due-date assignment with a time window for acceptable lead-timescitations
Places of action
Organizations | Location | People |
---|