380.256 PEOPLE
People | Locations | Statistics |
---|---|---|
Seuring, Stefan |
| |
Nor Azizi, S. |
| |
Pato, Margarida Vaz |
| |
Kölker, Katrin |
| |
Huber, Oliver |
| |
Király, Tamás |
| |
Spengler, Thomas Stefan |
| |
Al-Ammar, Essam A. |
| |
Dargahi, Fatemeh |
| |
Mota, Rui |
| |
Mazalan, Nurul Aliah Amirah |
| |
Macharis, Cathy | Brussels |
|
Arunasari, Yova Tri |
| |
Nunez, Alfredo | Delft |
|
Bouhorma, Mohammed |
| |
Bonato, Matteo |
| |
Fitriani, Ira |
| |
Autor Correspondente Coelho, Sílvia. |
| |
Pond, Stephen |
| |
Okwara, Ukoha Kalu |
| |
Toufigh, Vahid |
| |
Campisi, Tiziana | Enna |
|
Ermolieva, Tatiana |
| |
Sánchez-Cambronero, Santos |
| |
Agzamov, Akhror |
|
Shakhlevich, Natalia V.
in Cooperation with on an Cooperation-Score of 37%
Topics
Publications (10/10 displayed)
- 2023Preemptive scheduling of parallel jobs of two sizes with controllable processing timescitations
- 2019Shop scheduling problems with pliable jobscitations
- 2018Models and algorithms for energy-efficient scheduling with immediate start of jobscitations
- 2016Necessary and sufficient optimality conditions for scheduling unit time jobs on identical parallel machinescitations
- 2011A polynomial-time algorithm for a flow-shop batching problem with equal-length operationscitations
- 2011Inverse scheduling: two-machine flow-shop problemcitations
- 2010Parallel batch scheduling of equal-length jobs with release and due datescitations
- 2009Inverse scheduling with maximum lateness objectivecitations
- 2005Pre-Emptive Scheduling Problems with Controllable Processing Timescitations
- 2004Complexity Results for Flow-Shop and Open-Shop Scheduling Problems with Transportation Delayscitations
Places of action
Organizations | Location | People |
---|