479.575 PEOPLE
People | Locations | Statistics |
---|---|---|
Ziakopoulos, Apostolos | Athens |
|
Vigliani, Alessandro | Turin |
|
Catani, Jacopo | Rome |
|
Statheros, Thomas | Stevenage |
|
Utriainen, Roni | Tampere |
|
Guglieri, Giorgio | Turin |
|
Martínez Sánchez, Joaquín |
| |
Tobolar, Jakub |
| |
Volodarets, M. |
| |
Piwowar, Piotr |
| |
Tennoy, Aud | Oslo |
|
Matos, Ana Rita |
| |
Cicevic, Svetlana |
| |
Sommer, Carsten | Kassel |
|
Liu, Meiqi |
| |
Pirdavani, Ali | Hasselt |
|
Niklaß, Malte |
| |
Lima, Pedro | Braga |
|
Turunen, Anu W. |
| |
Antunes, Carlos Henggeler |
| |
Krasnov, Oleg A. |
| |
Lopes, Joao P. |
| |
Turan, Osman |
| |
Lučanin, Vojkan | Belgrade |
|
Tanaskovic, Jovan |
|
Demeulemeester, Erik
in Cooperation with on an Cooperation-Score of 37%
Topics
Publications (25/25 displayed)
- 2018A Model Enhancement Approach for Optimizing the Integrated Shift Scheduling and Vehicle Routing Problem in Waste Collectioncitations
- 2018A three-stage mixed integer programming approach for optimizing the skill mix and training schedules for aircraft maintenancecitations
- 2015A model enhancement heuristic for building robust aircraft maintenance personnel rosters with stochastic constraintscitations
- 2015A Two-Stage Mixed Integer Programming Approach for Optimizing the Skill Mix and Training Schedules For Aircraft Maintenancecitations
- 2014A model enhancement heuristic for building robust aircraft maintenance personnel rosters with stochastic constraints
- 2014A Tabu Search Heuristic for Building Aircraft Maintenance Personnel Rosters
- 2013A rolling horizon framework for an aircraft line maintenance problem
- 2013A Rolling Horizon Approach for Aircraft Line Maintenance Scheduling
- 2013A three-stage approach for aircraft line maintenance personnel rostering using MIP, discrete event simulation and DEAcitations
- 2013A Two-stage MIP Approach to Optimize the Skill Mix and Training Schedules for Aircraft Maintenance
- 2013Algorithms for building optimal aircraft maintenance personnel rosters
- 2013Integrated staffing and scheduling for an aircraft line maintenance problemcitations
- 2012Testing the quality of personnel rosters for aircraft line maintenance
- 2012Theory versus practice: study of personnel rosters for aircraft line maintenance
- 2012Optimizing workforce schedules for aircraft line maintenance
- 2012A Model Enhancement Heuristic for Building Aircraft Maintenance Personnel Rosters under Uncertainty
- 2012A Tabu Search Heuristic for Building Aircraft Maintenance Personnel Rosters
- 2012Improving Workforce Scheduling of Aircraft Line Maintenance at Sabena Technicscitations
- 2012A model enhancement heuristic for building robust aircraft maintenance personnel rosters under stochastic constraints
- 2011An integrated simulation approach for an aircraft line maintenance staffing and scheduling problem
- 2011A simulation analysis of work schedules for aircraft line maintenance operations
- 2011Improving Workforce Scheduling of Aircraft Line Maintenance at Sabena Technicscitations
- 2010A heuristic branch-and-bound approach for aircraft line maintenance staffing and scheduling
- 2010Integrated staffing and scheduling for an aircraft line maintenance problem
- 2009Integrated Workforce Staffing and Scheduling: A Case Study at a Major Aircraft Maintenance Company
Places of action