People
Toth, Paolo
in Cooperation with on an Cooperation-Score of 37%
Topics
- school
- routing
- school bus
- bus stop
- vehicle occupant
- passenger
- railroad train
- scheduling
- costs
- timetable
- railroad network
- crew scheduling
- rolling stock
- assessment
- case study
- infrastructure
- travel time
- indicating instrument
- occupation
- automotive engineering
- operations research
- management science
- timetable scheduling
- air traffic control
- air traffic
- drone
- data
- airplane
- optimization
- laceration
- airport
- train consist
- airspace
- traffic management
- highway traffic control
- prevention
- heuristic algorithm
- automation
- traveling salesman problem
- integer programming
- cutting
- planning stage
- air traffic data
- managerial personnel
- price
- departure time
- face
- arrival and departure
- stopping
- aircraft
- control device
- air transportation
- linear programming
- airport runway
- workload
- dispatcher
- tabu search
- airport capacity
- sequencing
- air traffic controller
- dynamic programming
- deviation
- logistics
- commodity
- bus
- supply chain
- truck
- air shipment
- ground transportation
- supply chain management
- machinery
- human being
- interface
- perturbation
- vehicle
- specification
- psychology
- mixed integer programming
- engine
- railroad car
- planning method
- seat
- complex system
- line planning
- benchmark
- survey
- mathematical model
- bottleneck
- constraint
- heuristic method
- travel
- travel cost
- customer
- vehicle capacity
- freight transportation
- passenger train
- freight train
- speech
- route guidance
- driver
- railroad track
- corporation
- signaling
- maintenance practice
- infrastructure management
- railway undertaking
- modeling
- hub
- graph
- railway company
- show 80 more
Publications
- 2020A partial allocation local search matheuristic for solving the school bus routing problem with bus stop selectioncitations
- 2018Robust Train Timetablingcitations
- 2016A three-level framework for performance-based railway timetablingcitations
- 2016The Time Dependent Traveling Salesman Planning Problem in Controlled Airspacecitations
- 2015A three-level framework for performance-based railway timetabling
- 2015A tutorial on non-periodic train timetabling and platforming problemscitations
- 2015Improved rolling horizon approaches to the aircraft sequencing problemcitations
- 2015Micro-macro approach to robust timetabling
- 2014State Space Reduced Dynamic Programming for the Aircraft Sequencing Problem with Constrained Position Shiftingcitations
- 2014Guest editorial to the Special Issue “Routing and Logistics” (VeRoLog 2012)citations
- 2014Tools for real-time perturbation management including human machine interface
- 2013A Tutorial on Train Timetabling and Train Platforming Problems
- 2013An exact algorithm for the multitrip vehicle routing problemcitations
- 2013Functional design of robust and resilient timetable models
- 2013Functional and technical requirements specification for perturbation management
- 2013Assessment of state-of-art of train timetabling
- 2012Aircraft Sequencing Problems via a Rolling Horizon Algorithmcitations
- 2012Models and Algorithms for the Train Unit Assignment Problemcitations
- 2012Models and algorithms for the Asymmetric Traveling Salesman Problem: an experimental comparisoncitations
- 2011Solution of the Train Platforming Problemcitations
- 2010Exact Methods for the Multi-Trip Vehicle Routing Problem
- 2010Exact algorithms for routing problems under vehicle capacity constraintscitations
- 2010Scheduling Extra Freight Trains on Railway Networkscitations
- 2007Route 2005: Recent advances in vehicle routing optimizationcitations
- 2007Passenger Railway Optimizationcitations
- 2006A Lagrangian Heuristic Algorithm for a Real-World Train Timetabling Problemcitations
- 2004State-of-the-Art and User Needs in Capacity Management and Access Charging (Project Report of the PARTNER project)
- 2002Models, relaxations and exact approaches for the capacitated vehicle routing problemcitations
- 2002Modeling and solving the train timetabling problemcitations
Places of action